From: Vibhor Agrawal (vibhora_at_g.clemson.edu)
Date: Fri Aug 02 2013 - 21:44:47 CDT
Dear Namd Users
I have a small doubt the way RMSD calculation are done in NAMD.
i have a trajectory of 783 frames and when I try to calculate the RMSD
,Calculations are based on the first frame as a reference. Is it possible
to calculate the RMSD based with the pdb structures as a reference.
Thanks
Vibhor
This archive was generated by hypermail 2.1.6 : Wed Dec 31 2014 - 23:21:30 CST